top of page

Progress Update


Oh we are getting close!! The flooring and baseboards are in! The lighting has been installed (oil rubbed bronze finishing), the doors (shaker style) and trim (4" baseboards) are painted and waiting for install. The cabinets are on schedule for installation at the end of this month.


Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square

Page design by Maxine Larway  RIVERVIEW CONDOS 2023

bottom of page