Page design by Maxine Larway  RIVERVIEW CONDOS 2019

Progress Update

February 11, 2017

Oh we are getting close!! The flooring and baseboards are in! The lighting has been installed (oil rubbed bronze finishing), the doors (shaker style)  and trim (4" baseboards) are painted and waiting for install. The cabinets are on schedule for installation at the end of this month. 

 

 

 

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square